SCE&G begins work in the loading dock area on Monday, February 14, 2011. As reported in the 1/28/2011 meeting summary, SCE&G will be upgrading their equipment and will need to turn off the power to FSH for a period of time, possibly 6 hours a day for 2 days. The exact timing of the power outage(s) is still to be determined. The Board will notify homeowners and residents of the time(s) for the power outage as soon as SCE&G gives us the information.
-
Recent Posts
Recent Comments
- Russell Holliday on Sept. 11, 2017: Irma – Photos
- Beth Dixon on Summary: October 27, 2014 Annual Meeting
- Beth Dixon on Annual Christmas Party at FSH
Archived Posts by Month
Categories
Administration